* width x lenght (can be increased or decreased every 3 or 4 meters according to pavilion section step).
Roof and side covers are connected to the frame construction by installing the covers into special grooves in the profiles. The cover is manufactured from flame retardant (DIN4102B1/M2 standard), light translucent material, both sides of which are covered by an acrylic layer. The roof and side covers of the structure can also be produced from blackout (light-proof) material of different colors.
Manufacture term is 2 - 4 weeks after prepayment.
Additional equipment:
Windows (1,25 m x 1,7 m) - 45 Eur/unit.
Partition- 15 Eur/m2.
Aditional entrances (curtains type) - 30 Eur/unit.
Advertisement - 25 - 45 Eur/m2.
**Prices Ex Works Klaipeda, without VAT.
Erection
Please let us know a model of your interest and we will send you agreement.